In anticipation of planned resurfacing in late 2021 on Forsyth Street, CAP/ADID is developing conceptual street sections to reconfigure the existing roadway between Memorial Drive and Peachtree Street into a more multimodal corridor.
Due to varying conditions throughout the corridor, a consultant team proposed four different streets sections to meet the multimodal needs in different locations.
CAP/ADID will be embarking on additional work in early 2021 to advance street design from concept into preliminary engineering.
For additional information about this project, contact Wesley Brown at wbrown@atlantadowntown.com.